Revision history of "File:Electrical Transmission.ana"

Diff selection: Mark the radio boxes of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

  • curprev 22:26, 22 July 2008Lchrisman talk contribs 198 bytes +198 An example model that uses a linear program to how much power to generate at each power plant given demand at each node, generation costs at each plant, and constraints on plant and branch capacity.